We’re asking parents from every elementary school to register to speak at the January 30th hearing and speak about the impact closing Peebles will have on YOUR school.

You can register to speak by emailing the school board secretary, Rose Mary Ryan, at rryan@northallegheny.org.

If Peebles had closed this year, the impact on the remaining elementary school buildings would have been as outlined below (based on the administration’s October 24, 2012 proposed floor plans and their November 28, 2012 school board presentation):

Impact on Marshall Elementary

  • Marshall would have picked up 138 new students
  • Its operating capacity would have gone from 79% to 95%
  • 5th grade would have had to operate 5 sections (instead of 4)
  • 4th grade would have had to operate 5 sections (instead of 4)
  • 3rd grade would have had to operate 6 sections (instead of 5)
  • 2nd grade would have had to operate 6 sections (instead of 5)
  • 1st grade would have had to operate 7 sections (instead of 6)
  • Kindergarten would have had to operate 5 sections (instead of 4)

Based on the October 24th proposed floor plans, Marshall would’ve had to use its 4th Centrum and GOAL room as classrooms.

Only one “spare” room would’ve remained and it’s currently used for the YMCA program.

According to the Sept 28, 2011 school board minutes, the Venango Trails development (adjacent to Marshall) could add 190 students to the Marshall area.

Impact on McKnight Elementary

  • McKnight would have picked up 57 new students
  • Its operating capacity would have gone from 88% to 95%
  • 5th grade would have had to operate 6 sections (instead of 5)
  • 4th grade would have increased by 2 students per class (current class sizes are 27, 27, 28, 28, 28, but would’ve been 29, 29, 30, 30, 30).
  • 3rd grade classes would have increased to 29 students in EVERY CLASS
  • 2nd grade would have had to operate 6 sections (instead of 5)
  • 1st grade would have increased to 25 students in EVERY CLASS
  • Kindergarten would have picked up 6 new kids

Based on the October 24th proposed floor plans, only 2 “spares” would’ve remained at McKnight (the Student Assistance room and Faculty Lounge).

An increase of 1 student in 1st grade and 3 students in 4th grade would’ve required the use of both spares, unless the district goes above class size guidelines.

Impact on Ingomar Elementary

  • Ingomar would have picked up 79 new students
  • Its operating capacity would have gone from 75% to 90%
  • 5th grade classes would have increased by 4 students per class (current class sizes are 23, 23, and 23, but would’ve been 27, 27, 27)
  • 4th grade classes would have increased by an average of 7 students per class (current class sizes are 21, 22, and 23, but would’ve been 29, 29, and 28)
  • 3rd grade would have had to operate 4 sections (instead of 3)
  • 2nd grade would have had to operate 4 sections (instead of 3)
  • 1st grade classes would have increased by an average of 2 students per class (current class sizes are 21, 21, 22, but would’ve been 24, 24, 24)
  • Kindergarten would’ve had 13 new kids and operated an extra section

Based on the October 24th proposed floor plans, only 2 “spares” would’ve remained at Ingomar (the LGI room and GOAL room). The LGI room has no windows. An increase of 4 students in 1st grade and an increase of 5 students in 4th grade would’ve required the use of both spares, unless the district goes above class size guidelines.

Impact on Bradford Woods Elementary

  • Bradford Woods would have picked up 36 new students
  • Its operating capacity would go from 74% to 81%
  • 5th grade would have increased by an average of 3 students per class (current class sizes are 24, 24, 26, but would’ve been 28, 28, 27)
  • 4th grade would have increased by an average of 2 students per class (current class sizes are 24, 25, 25, but would’ve been 27, 27, 27)
  • 3rd grade would have increased by an average of 3 students per class (current class sizes are 21, 21, 22, but would’ve been 24, 24, 24)
  • 2nd grade would have had to operate 4 sections (instead of 3)
  • 1st grade would have remained the same
  • Kindergarten would have increased by an average of 1.5 students

Based on the October 24th proposed floor plans, only 2 “spares” would’ve remained at Bradford Woods (the Life Skills and GOAL room). According to the Sept 28, 2011 school board minutes, the Venango Trails development (adjacent to Bradford Woods) could add 190 students to the Marshall area.

Impact on Hosack Elementary

  • Hosack would have picked up 135 new students
  • Its operating capacity would go from 61% to 86%
  • 5th grade would have operated with 3 sections (instead of 2)
  • 4th grade would have operated with 3 sections (instead of 2)
  • 3rd grade would have operated with 3 sections (instead of 2)
  • 2nd grade would have operated with 4 sections (instead of 3)
  • 1st grade would have operated with 4 sections (instead of 2)
  • Kindergarten would have operated with 3 sections (instead of 2)

Based on the October 24th proposed floor plans, only one “spare” would’ve remained at Hosack (the Learning Support room).

An increase of 6 students in either 3rd or 4th grade would’ve required the use of Hosack’s only spare room, unless the district goes above class size guidelines.

Hosack sits adjacent to several housing plans that are currently under construction, including Heartland Homes Waterford Place.

Impact on Franklin Elementary

  • Franklin’s enrollment would decrease by 59 students because it is currently operating above its target capacity of 510 students (it has 515 students)
  • Its operating capacity would go from 96% to 85%.
  • 5th grade would have operated 3 sections (same as currently).
  • 4th grade would have operated 3 sections (same as currently).
  • 3rd grade would have increased by an average of 3 students per class.
  • 2nd grade would have operated 4 sections (same as currently).
  • 1st grade would have operated 4 sections (same as currently).
  • Kindergarten would have operated 3 sections instead of 4.

Based on the October 24th proposed floor plans, only 2 “spares” would’ve remained at Franklin. One is a faculty lounge that is only 645 square feet. Franklin sits adjacent to several housing developments along Nicholson Road that include 85+ single family homes, 110+ townhouses, and 225+ apartments.

Advertisements

The latest installment of the district’s propaganda for closing Peebles is titled “FAQ: The Recommendation to Close Peebles Elementary School.”  Here are the 5 points we find most interesting:

  1. “NASD could close a small elementary school and still have 9 spare classrooms to work with for flexibility in the remaining six schools.”  The administration listed 11 spare classrooms in their Nov 28, 2012 presentation to the school board, but now they only have 9.  To be clear, 9 spares across 6 schools means some buildings would only have 1 spare available to manage class size.
  2. “Class size would not be affected.” 

The administration is using averages to mask what is happening on a per building basis.  The administration’s Nov 28, 2012 slides clearly illustrate that:

(1) McKnight, Ingomar, and Bradford Woods would have seen an increase in class size across multiple grade levels, and

(2) there would be 17 classes with 29+ students and minimal ability to manage class size given only one spare in some schools.

  1. “Peebles has no ‘spare classrooms’ when the facility is analyzed under the guidelines of the redistricting model, which allows for 4 sections of grades K-2.”  This highlights one of the biggest issues related to the district’s new model; the small schools that remain would be required to run 4 sections of K-2, even though they were only designed to run 3 sections.  The reason why no “spare” exists at Peebles, and only 1 or 2 “spares” exist in the remaining buildings, is because Hosack, Bradford Woods, Franklin, Ingomar, and Peebles were NOT designed to operate as 4-round schools.   
  2. “Closing Peebles Elementary School will save NASD at least $1.25M each year for the next seven years.”  The administration listed a savings of $850,000 in its Nov 28, 2012 presentation to the school board.  We wish we could explain the $400,000 change, but as we’ve already seen, the data supporting this recommendation is not consistent and continues to be a moving target.
  3. “The District does not have a tenant for the Peebles building.”  It has been confirmed that LaRoche College is the potential tenant for Peebles Elementary.  Since an official legal document is not in place, the district can technically state it “does not have a tenant.”  The administration illustrated its fondness for semantics when it recently told the Tribune Review it had “no substitute costs” because its substitutes were hired through a contractor.  Given the administration’s cost savings calculation is contingent on $1M of “Potential Lease Revenue,” it’s clear that there is indeed a tenant for Peebles.

Saving the best for last: “Mr. Thomas donated his services free of charge to complete this work.”  So, Mr. Thomas, a consultant from a construction management firm, “donated all of his services” to complete the Phase 2 report and recommended closing a school with $0 repairs instead of one with $14 million in repairs.  Nothing more needs to be said.

Today’s Post Gazette- Pittsburgh North section includes several letters to the editor that further detail the issues surrounding the recommendation to close an elementary school: [To read the letters, click here:]

  • Over-crowding threatened if NA closes Peebles
    • “Why does North Allegheny know better than the Pennsylvania Department of Education? The state recommends a class size of 25 in the elementary grades.”
  • Savings ‘insignificant’ against impact on students
    • “Now the NA school board is considering closing a highly ranked elementary school, which will lead to significant redistricting.”
  • NA not following best practices
    • “This process includes forming a committee of a cross-section of residents to examine the condition of every school, per-pupil operating costs, transportation costs associated with each facility and a property appraisal of each school.”
  • Expenses first, close schools later
    • “Closing Peebles Elementary School, whose students flourish among the highest in the North Allegheny district, should be a last resort after all other possible solutions have been exhausted. This has not yet occurred to the satisfaction of the community.”

What would McKnight Elementary have looked like if Peebles was closed this year?  This slide is from the Administration’s November 28th presentation to the school board:  MCK Scenario #1  

  • McKnight would pick up 57 new students if Peebles was closed.
  • Its operating capacity would go from 88% to 95%.
  • 5th grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced the ESL program).
  • 4th grade would have increased by 2 students per class (current class sizes are 27, 27, 28, 28, 28, but would have been 29, 29, 30, 30, 30).
  • 3rd grade classes would have increased by 3 students per class (current class sizes are 26, 26, 26, 26, 26, but would have all been 29 students).
  • 2nd grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced programs operating in that room).
  • 1st grade would have increased to 25 students in EVERY CLASS (which is the district class size guideline for grades K-2).
  • Kindergarten would pick up 6 new kids and no new sections.
  • With the extra sections added under the new model (grades 2 and 5), 2 spare “classrooms” would remain (Student Assistance Room and Faculty Lounge).
  • If current enrollment goes up, McKnight would have to use its Student Assistance Room and Faculty Lounge as classrooms.

Using Pennsylvania Department of Education guidelines, McKnight has an 875 student gross capacity.  As discussed in yesterday’s post, buildings are not designed to run at gross capacity.  If Peebles is closed, McKnight would have an enrollment of 851 students and be just 24 students shy of operating at its gross capacity.

To learn more about the impact of operating at gross capacity, go to the Building Utilization Video on the North Allegheny School District web site.  Let the video load and listen to the consultant’s comments at minute 42.  He states that it’s unrealistic to operate buildings at gross capacity and that the district does not have the ability to close an elementary school unless it abandons Pennsylvania Department of Education guidelines and uses its own guidelines instead.

See page 19 (Attachment #6) of the SaveNASchools Community Report for Pennsylvania Department of Education gross capacity guidelines at each school.  Reference the far left column titled “PDE Capacity per Most Recent PlanCon Submission” to locate the 875 student gross capacity for McKnight.