Today is the last day to call the school board office to register to speak at the meeting on Wednesday, December 19th.  Please call 412-369-5437 and request to speak at the BEGINNING of the meeting.  We need every parent to advocate for their child by standing up and asking school board members to vote against scheduling a public hearing. 

The recommendation to close an elementary school moves students into non-classroom spaces for direct instruction.  This is simply unacceptable.  Every child in the North Allegheny school district deserves to be in a classroom to learn. 

If Peebles had been closed this year, the following non-classrooms would have been used:

  • Marshall would have had to operate a class out of their 4th Centrium (large group instructional space)
  • Marshall would have had to operate another class out of their GOAL room
  • McKnight elementary would have had to operate a class out of their ESL room


Under the new model, the remaining buildings are pushed so close to their Pennsylvania Department of Education gross capacities that only non-classrooms remain as “spare” classrooms.  

  • Hosack would only have one spare classroom available; it’s the learning support room
  • Marshall would only have one spare classroom available; it’s the YMCA room
  • Ingomar would only have two spare classrooms available; one does not have windows and the other is the GOAL room
  • McKnight would only have two spare classrooms available; one is the faculty lounge and the other is the student assistance room
  • Bradford Woods would only have two spare classrooms available; one is the Life Skills room and the other is the GOAL room
  • Franklin would only have two spare classrooms available; one is a faculty lounge and its only 645 square feet


There is no cost savings or operational efficiency benefit that can justify compromising the education of our elementary school students. 

If the Administration and Board have run out of ideas, why not bring the community on board to help brainstorm ways to keep this district strong in light of trying economic times?  Why not establish a community task force to review every line item in the district’s budget and determine where we need to set our priorities?  Why are we in such a rush to do something as drastic and irreversible as closing a school after seeing how detrimental the impact will be on our elementary students? 

“If we close an elementary school, change will be felt throughout the system,” said Dr. Brian Miller, Assistant Superintendent for K-12 education. “If you remove a small school from our system, the entire system will be affected.” [PG Article, October 25, 2012.]

The information included on the Administration’s November 28th slides (detailed in recent posts) provides the basis for the following conclusions:

  1. Under the new model, the remaining buildings will see an increase in class size across several grade levels (especially grades 3-5).
  2. Under the new model, the remaining buildings will see an increase in sections across several grade levels (the only way to hold class sizes below district guidelines is by regularly operating spare classrooms as regular classrooms).
  3. Under the new model, the use of spare classrooms as regular classrooms makes the remaining buildings dependent on non-classrooms as spare classrooms.
  4. The use of non-classrooms as spare classrooms would displace programs integral to the elementary curriculum that are currently operating in those spaces (e.g. learning support, music, GOAL).
  5. Increase in class size and increase in sections means the remaining buildings will be operating above their Pennsylvania Department of Education target capacity and dangerously close to gross capacity.

We believe that the 5 points listed above compromise the district’s ability to deliver the same level of excellence in education under the new model that it does now.

Further, the Administration’s slides illustrate that the new model cannot reasonably accommodate an increase in student enrollment. If the district grows, it could face spending more money than it saved from closing a building.

Today we conclude our series on class size and capacity issues at the remaining buildings by focusing on Marshall and Bradford Woods Elementary.

Please note that we will not be reviewing Hosack or Franklin.  Hosack already has class sizes of 30+ students (and thus will not see an increase in class size).  Franklin is already operating above its target capacity with a current enrollment of 515 students (and thus will not see an increase in capacity). For those interested, here for the slides on Hosack and Franklin.

That said, what would Marshall and Bradford Woods Elementary have looked like if Peebles was closed this year?  These slides are from the Administration’s November 28th presentation to the school board:  MES and BWE.

Marshall Elementary
  • Marshall would pick up 138 new students if Peebles was closed.
  • Its operating capacity would go from 79% to 95%.
  • 5th grade would have had to operate 5 sections (instead of 4) and use a spare room (which would have displaced programs operating in that room).
  • 4th grade would have had to operate 5 sections (instead of 4) and use a spare room (which would have displaced programs operating in that room).
  • 3rd grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced programs operating in that room).
  • 2nd grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced programs operating in that room).
  • 1st grade would have had to operate 7 sections (instead of 6) and use a spare room (which would have displaced programs operating in that room).
  • Kindergarten would have had to operate 5 sections (instead of 4).
  • With the 6 extra sections added under the new model, Marshall would have had to use its 4th Centrium (large group instruction space) and GOAL room as classrooms.  Only one spare classroom would have remained and it is used for the YMCA program.
  • If current enrollment goes up, Marshall would have to use its YMCA room as a classroom.  No other spare classrooms exist.  Marshall would face class sizes of 25+ for grades K-2 and 30+ for grades 3-5 if there is growth in the Marshall area (e.g. Venango Trails development with 400+ proposed single family homes.) 
Bradford Woods Elementary
  • Bradford Woods would pick up 36 new students if Peebles was closed.
  • Its operating capacity would go from 74% to 81%.
  • 5th grade would have increased by an average of 3 students per class (current class sizes are 24, 24, 26, but would have been 28, 28, 27).
  • 4th grade would have increased by an average of 2 students per class (current class sizes are 24, 25, 25, but would have been 27, 27, 27).
  • 3rd grade would have increased by an average of 3 students per class (current class sizes are 21, 21, 22, but would have been 24, 24, 24).
  • 2nd grade would have had to operate 4 sections (instead of 3) and use a spare classroom (which would have displaced programs operating in that classroom)
  • 1st grade would have remained the same.
  • Kindergarten would have increased by an average of 1.5 students 
  • If current enrollment goes up, Bradford Woods would have to use its GOAL room and Life Skills room as classrooms.

What would McKnight Elementary have looked like if Peebles was closed this year?  This slide is from the Administration’s November 28th presentation to the school board:  MCK Scenario #1  

  • McKnight would pick up 57 new students if Peebles was closed.
  • Its operating capacity would go from 88% to 95%.
  • 5th grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced the ESL program).
  • 4th grade would have increased by 2 students per class (current class sizes are 27, 27, 28, 28, 28, but would have been 29, 29, 30, 30, 30).
  • 3rd grade classes would have increased by 3 students per class (current class sizes are 26, 26, 26, 26, 26, but would have all been 29 students).
  • 2nd grade would have had to operate 6 sections (instead of 5) and use a spare room (which would have displaced programs operating in that room).
  • 1st grade would have increased to 25 students in EVERY CLASS (which is the district class size guideline for grades K-2).
  • Kindergarten would pick up 6 new kids and no new sections.
  • With the extra sections added under the new model (grades 2 and 5), 2 spare “classrooms” would remain (Student Assistance Room and Faculty Lounge).
  • If current enrollment goes up, McKnight would have to use its Student Assistance Room and Faculty Lounge as classrooms.

Using Pennsylvania Department of Education guidelines, McKnight has an 875 student gross capacity.  As discussed in yesterday’s post, buildings are not designed to run at gross capacity.  If Peebles is closed, McKnight would have an enrollment of 851 students and be just 24 students shy of operating at its gross capacity.

To learn more about the impact of operating at gross capacity, go to the Building Utilization Video on the North Allegheny School District web site.  Let the video load and listen to the consultant’s comments at minute 42.  He states that it’s unrealistic to operate buildings at gross capacity and that the district does not have the ability to close an elementary school unless it abandons Pennsylvania Department of Education guidelines and uses its own guidelines instead.

See page 19 (Attachment #6) of the SaveNASchools Community Report for Pennsylvania Department of Education gross capacity guidelines at each school.  Reference the far left column titled “PDE Capacity per Most Recent PlanCon Submission” to locate the 875 student gross capacity for McKnight.

If Peebles had been closed this year, how would the other buildings have been impacted?  We will be highlighting class size and other issues at the remaining buildings in our posts this week.  Today’s focus is on Ingomar Elementary. [Click IES- final (scenario #1) for more detail. The slide is from the Administration’s November 28th presentation to the school board.]

  • Ingomar would pick up 79 new students if Peebles was closed.
  • Its operating capacity would go from 75% to 90%.
  • 5th grade classes would have increased by 4 students per class (current class sizes are 23, 23, and 23, but would have been 27, 27, 27).
  • 4th grade classes would have increased by an average of 7 students per class (current class sizes are 21, 22, and 23, but would have been 29, 29, and 28).
  • 3rd grade would have had to operate 4 sections (instead of 3) and use a spare classroom (which would have displaced programs operating in that room).
  • 2nd grade would have had to operate 4 sections (instead of 3) and use a spare classroom (which would have displaced programs operating in that room).
  • 1st grade classes would have increased by an average of 2 students per class (current class sizes are 21, 21, 22, but would have been 24, 24, 24).
  • Kindergarten would have had 13 new kids and operated an extra section.
  • With the extra sections added under the new model 2 spare “classrooms” would remain (the Music room and GOAL room).
  • If current enrollment goes up, Ingomar would have to use its Music room and GOAL room as classrooms. 

This is the perfect illustration of operating at target capacity v. gross capacity.  It’s important to understand that buildings are designed to run at their target capacity and NOT gross capacity.  Pennsylvania Department of Education guidelines establish a 450 student target capacity and a 550 student gross capacity for Ingomar Elementary.

Current enrollment at Ingomar is 406 students.  If Peebles is closed, the enrollment at Ingomar Elementary would be 485 students.  Thus, Ingomar would be operating above its 450 student target capacity.  To reach its 550 student gross capacity, it would utilize additional rooms (Music and GOAL) to accommodate 65 more students (550-485).  This is why it’s not realistic to operate a building at gross capacity.

However, under the new model, the administration has abandoned Pennsylvania Department of Education guidelines and established a 510 student target capacity (instead of 450) for Ingomar.

Bottom Line:  Under the new model, the administration is targeting 104 more students at Ingomar than what it has now (510-406) by abandoning Pennsylvania Department of Education guidelines and using its own district guidelines instead.

To learn more about the impact of operating at gross capacity, go to the Building Utilization Video on the North Allegheny School District web site.  Let the video load and listen to the consultant’s comments at minute 42.  He states that it’s unrealistic to operate buildings at gross capacity and that the district does not have the ability to close an elementary school unless it abandons Pennsylvania Department of Education guidelines and uses its own guidelines instead.

See page 19 of the SaveNASchools Community Report  for Pennsylvania Department of Education target capacity and gross capacity guidelines for each school.

On December 19th, school board members will vote YES or NO to schedule a public hearing related to the closure of Peebles Elementary.  It is the school board members who have the power to close a school.  They are not required to follow the administration’s recommendation.  A public hearing is the first step in the process for closing the school.  We are launching a movement to get school board members to VOTE NO to the public hearing.

Here are the top 5 Things YOU can do:

  1. Register to speak at the December 19th meeting.  You can simply stand up and say “Vote NO” if you are not comfortable with public speaking.  Call 412-369-5437 and ask to speak at the BEGINNING of the meeting.
  2. Contact members of the school board.  You can call them or write them a letter.  Click here for Contact Information and here for a Form letter.  We suggest you focus your efforts on:
    1. Joe Greenberg
    2. Libby Blackburn
    3. Chris Jacobs
    4. Tom Schwartzmier

    PLEASE REQUEST THAT THE BOARD MEMBERS VOTE NO TO SETTING THE DATE FOR THE PUBLIC HEARING.  You can also use one (or more) of the following points as a basis for your conversation or voice mail.

  3. Write a letter to the editor.  Letters should be no more than 250 words and should only focus on one topic.  Click here for letter to the editor details and a link to the Post Gazette Editorial dept.
  4. Attend the December 19th meeting. Consider arranging childcare so that both you and your spouse can attend.  The meeting is at 7pm at Carson Middle School.
  5. Forward this email to 10 people.  Tell everyone YOU know about the impact on the remaining buildings. Explain that this is is not a done deal and get them to attend the meeting on December 19th!

Members of SaveNASchools met Sunday night at the Peebles Volunteer fire company to plan strategy and focus the group’s fight against the proposed closing of the Peebles Elementary School.

To read more from the North Allegheny Patch, click here:

http://northallegheny.patch.com/articles/north-allegheny-parents-meet-to-plot-strategy-focus-message-against-peebles-elementary-closing#photo-12513473

SaveNASchools is a group that advocates keeping all 7 of the district’s elementary schools open based on the following 5 points…

  1. We believe that the district’s elementary buildings should not operate above Pennsylvania Department of Education capacity guidelines.  The district does not have the ability to close an elementary school unless it accepts higher capacities than those established by the state.
  2. We believe that operating the remaining elementary buildings at capacities that depend on spare classrooms and increase class size will compromise the district’s ability to deliver excellence in education.  The new model will be dependent on spare classrooms the very first day, which have been identified as faculty lounges, learning support rooms and music rooms.  The remaining buildings will experience an increase in class size with respect to grades 3-5, except for Hosack (which already has classes of 30+ students) and Franklin (which is currently operating above capacity).
  3. We believe that 3rd grade should have a class size guideline of 25 students instead of 30 (similar to other districts).  The new model is based on 30 students for each 3rd grade class and operating six schools instead of seven does not provide the district with enough capacity to accept 25 students per class now or in the future.
  4. We believe that the decision to close a school could ultimately cost the district more money than it would save because the new model cannot reasonably accommodate future growth.  The 5-year enrollment projections prepared by the Administration have consistently understated actual enrollment for the past 13 years.
  5. We believe that the decision to close a school should be based upon solid, empirical evidence that such decision is in the best interest of the district as a whole.  The report that recommended closing Peebles Elementary used population data that does not tie to the 2010 U.S. Census and included a mathematical error that concludes there will be a decline in McCandless, when, in fact, the population is projected to remain stable.

On November 28th, the Administration recommended closing Peebles Elementary and estimated that the district would save $850,000 per year (contingent on a $1million/year lease).  That same night, it requested $856,000 to purchase new buses for next year. 

SaveNASchools recommends deferring the purchase of new buses for one year and appointing a community task force to provide additional thoughts and ideas for addressing the district’s projected deficits before moving forward with a process as drastic and irreversible as closing a school. 

A December 6th Post-Gazette article included a comment by a parent that said Peebles or Hosack students would be hurt by attending McKnight, which the parent categorized as an underperforming school.

This statement was not made by SaveNASchools.  It was made by a parent who attended the board meeting on November 28th.  SaveNASchools does not agree with the parent’s statement.

SaveNASchools is a group that believes the district is comprised of 7 top-notch elementary schools and advocated in its November 28th Community Report to keep all 7 elementary schools open.  Page 3 of the report specifically advocates for McKnight Elementary.  It notes that McKnight Elementary would become dependent on spare classrooms the first day the new elementary model went into effect and that the district’s ability to deliver excellence in education to these students would be compromised.

McKnight Elementary is a phenomenal school with a reputation for excellence.  SaveNASchools is comprised of many parents from McKnight Elementary and these families represent everything that makes this district great.

Wiring, windows recommended for NA schools

“…The district has 54 proposed projects at the schools, Newman Stadium, Baierl Center and the bus garage for a total cost of $2.6 million. Projects are proposed at most district buildings, with the exception of three elementary schools: Peebles, which the administration has proposed closing; Bradford Woods; and Marshall. Repairs to Bradford Woods and Marshall have been deferred to the fifth year of the plan, Mr. Gaertner said…”